Two Bathroom Renovations

Project consists of renovation of two bathrooms, the master bath, and a 2nd full bath. Master bath will have quartzite in the shower and on the vanity. 2nd bath will likely be tiled.

Master Bath

Scope of Work

Remove and replace windows by tub with sliding glass door

Remove and dispose bathtub

Remove wall tile and waterproof and prepare for stone fabricators. Amount of stone coverage open to discussion

Coordinate details with sub-contractors (tile, stone installers, and shower door installer)

Remove floor tile and waterproof and prepare for tile installer in both areas

Run existing bathtub water lines to outside shower

Install recessed shower valve and connect shower head outside

Replace existing shower valve with new

Build niche in shower

Install “Y” connection from on demand water heater to bathroom to reduce water waste

Replace lighting in shower with vapor proof lights that meet code

Repair damaged ceiling in shower

Remove and dispose of existing vanities and replace with new

Possibly move toilet 2 inches to meet code and accommodate stone

Other work as required to meet code and pass inspection

Existing

Proposed

2nd Bath

Scope of Work

Remove and replace tile in shower, and tile to ceiling. Remove tile behind toilet and replace with sheetrock.

Remove floor tile, waterproof, and prepare for floor tile installer

Remove and dispose of existing vanities and replace with new

Possibly replace toilet

Replace noisy exhaust fan with Panasonic fan

Replace existing shower valve with new

Remove and dispose of glass tub enclosure

Install pre-fab shower door (if we don’t buy a custom door)

Install recessed medicine cabinet

Existing
ItemSourceQuantity (if more than one)BrandModelURLCost
MASTER BATHROOM
Vanity
30" TBD
Countertops
QuarztiteTBD
Plumbing
Sink2KohlerKOHLER K-2209-47 Caxton Undercounter Bathroom Sink, Almond
FaucetTBDKohler
Tub/Shower FaucetKohler
Tub/Shower Valve
Tub/Shower TrimOwner acquired
Toilet w/ seatUse Existing
Tub/Shower Walls QuarztiteMSI
Shower Door
Empire Glass
Prefab or Custom Glass
Flooring
TileTBD
Lighting
Overhead LightingUse Existing
Ventilation
Accessories
Toilet paper holder
Towel Bars 24"2
Towel Bars 18"2
Permits & Rough Materials
2ND BATHROOM
Vanity
30" TBD
Countertops
QuarztiteTBD
Plumbing
SinkKohlerK-2209-47
FaucetTBDKohler
Tub/Shower FaucetKohler
Tub/Shower Valve
Tub/Shower TrimUse Existing or Replace
Toilet w/ seat
Tub/Shower Walls QuarztiteMSI
TubUse Existing
Shower Door
Empire Glass
Prefab or Custom Glass
Flooring
TileTBD
Lighting
Overhead LightingUse Existing
Ventilation
Medicine Cabinet
Medicine CabinetTBD
Accessories
Toilet paper holder
Towel Bars 24"2
Permits & Rough Materials
OUTSIDEPlumbingShower Valve
Shower Trim

Contractor Qualifications

Licensed and insured California contractor

Open to assistance by homeowner for tasks that can be cost effective, like demolition, toilet installation, and painting

Ability to provide references and photos of completed projects